Part 5 – Wastewater Drainage
5.17 Testing
All wastewater mains and branch pipelines, including extended connections, are to be flushed, CCTV inspected, then tested using the low pressure air test.
Note: The low pressure air test is described in the MPDC Infrastructure Code of Practice.