Part 4 – Stormwater Drainage
4.21 Stormwater Soakholes
Factory built proprietary structures are permissible subject to specific approval by Council.Provision must be made for secondary overland flow in compliance with the requirements of the NZ Building Code section E1 and the requirements of the Waikato Regional Council.
Note: The MPDC Soakage Guidelines provide a useful guide.