Part 4 – Stormwater Drainage
4.17 Ramped Risers
Unless required otherwise by Council, a ramped riser shall be constructed to bring the connection to within 0.9–1.5 m of ground level, or to such depth that will permit a gravity connection to service the whole lot.
Note: The MPDC Infrastructure Code of Practice provides acceptable details.