Return to home page

Appendix 8: Motumaoho Quarry, Winstone Aggregates Ltd

 

 

Noise Control Boundary

 

 

Appendix 12: Motumaoho Quarry, Winstone Aggregates Ltd




NOISE

The noise level from operational activities (excluding maintenance and construction activity) within or from the use of the Motumaoho Quarry site shall not exceed the following levels when measured at any point beyond the Quarry Noise Control Boundary.

 

 

PERIOD
October to March
Monday to Saturday 6.30am to 6.00 pm


NOISE LEVEL
55 dBA L 10
April to September
Monday to Saturday 6.30am to 5.00pm
And, provided that a nominated representative of the residents of
Harbottle Road has been informed, during additional hours as follows:
Monday to Friday 5.00pm to 6.00pm
55 dBA L 10
At all other times
45 dBA L 10
Everyday 10.00pm to 6.30am 70 dBA Lmax

 

The General Provisions of Rule 5.2.1 shall be taken into account except that the duration of any individual measurement period shall be not less than 30 minutes.