9.2 Railways

9.2.1 Sight Lines at Railway Crossings

Where a railway and road intersect on the same level the sightlines shall be maintained in accordance with the requirements of the MPDC Development Manual 2010.  Where sight lines are included as a legal encumbrance on a land title and written approval has been given by the requiring authority, then they shall override the District Plan requirements

 

 

Objectives/Policies
3.8.2 O1, O5 P1