1.1 Information requirements for resource consents
1.2 Development suitability
1.3 Standards and terms for controlled activity resource consent applications
1.5 Notified and non-notified consents
3.1 Residential zone
3.2 Rural and rural-residential zones
3.3 Industrial zone and any site identified as a scheduled site with a development concept plan
3.4 Business Zone
3.5 Signage
5.2 Noise
9.1 Access, parking, loading
11.1 General
11.3 Site suitability
11.4 Flooding
11.5 Geotechnical structural area